| SN No. | Name | Scope Of Work | Funded By | Period | Cost |
|---|---|---|---|---|---|
| 1 | Modernization of Telecommunication Network for Digital Connectivity | Installation of: i) IMS platform at three places ii) AGW & GPON system iii) Transmission system iv) IP system v) BOSS system | ADP (GoB & Government Concessional Loan of China) | 01 July 2017 to June 2024 | Total Project Cost: 331494.05, (GOB: 149766.11 (Equity:100082.595 |
| 2 | Replacement of old Digital Telephone System of Dhaka city (171 KL) | 1. NGN based Switching & MGW, MGC, Access gateway 2. PSDN, AAA, NMS 3. FTTX 4. XDSL 5. Optical Fiber 450 km. | BTCL | 01 Sep 2009 to 30 Jun 2013 Extended to 30 June 2014 Extended to 30 Sep 2014 | 24806.00 lac |
| 3 | ILDTS Policy-2007 Compliance Project. | 1. Installation of IGW with NGN facility 2. Installation of ICX at Dhaka, Chittagong, Sylhet, Khulna & Bogra 3. Upgrading BTCL’s existing IIG 4. Central Billing System 5. Computerized Accounting System | BTCL | 01 Apr 2009 to 30 Sep 2013 Extended to 30 Apr 2014 | 10744.00 lac |
| 4 | Optical Fiber Cable Network development at Upzilla level (290 Upazilla) | 1. Transmission equipment: STM16 & STM1 Mux 2. a) OFC Network from Upzilla to Union (11060 km) b) OFC Network Accessories 3. Balancing equipment (M/W, SDH Link, Sever ports etc.) | ADP | 01 Jan 2013 to 31 Dec 2015, Extended to 30 Jun 2016 | Local: 40470.48 lac, Foreign: 9457.66 lac, Total: 49928.14 lac |
| 5 | Optical Fibre Cable Network development in 1000 Union Parishad (1006 Union Parishad) Contact: Project Director, OFCNDP in 1000 UP Phone: 9320258 Project Summary (12Nov2014) | 1. Transmission equipment : STM16 & STM1 Mux 2. a) OFC Network from Upzilla to Union (11060 km) b) OFC Network Accessories 3. Balancing equipment (M/W, SDH Link, Sever ports etc.) | ADP | 01 (Jan 2012-30 Jun 2014 Extended to 30 Jun 2016) | Local: 49088.29 lac, Revised: 56824.02 lac, Foreign: 22818.15 lac, Revised: 15073.07 lac, Total: 71906.44 lac, Revised: 71807.09 lac (GoB Fund, Equity) |
| 6 | Telecommunication Network Development Project (TNDP) Contact: AGM, TNDP Phone: 9102712 | 1. NGN (IMS) based Telecommunication System with IN & Access Gateway 2. International Gateway Exchange (IGW) 3. National Transmission Backbone OFC Network 1400 km, SDH M/W link 4. Access Facilities-FTTX 5. Wireless Access-WLL 6. ADSL & DSLAM 7. 24/7 National Operation Center (NoC) | ADP | 01 Jul 2009 - 30 Jun 2013 Extended to: 30 June 2015 | GOB: 11350.72 lac, P.A: 50935.53 lac, Total: 62286.25 lac |
| 7 | Installation of Optical Fiber Cable (OFC) Network at all Govt.College/University and Training Institute Project.Telejogajog Bhaban,37/E, Eskaton Garden, Dhaka-1000.Phone: 02-932-0326 | 1) Cable Purchased from BCS Khulna. 2) OSP Part on Full Turn-key Basis Package-01, Lot-1: Total 178 sites of Dhaka & Mymensingh Division. 3) OSP Part on Full Turn-key Basis Package-01, Lot-2: Total 235 Sites of Barishal, Chittagong, & Khulna Division. 4) OSP Part on Full Turn-key Basis Package-01, Lot-3: Total 174 Sites of Rajshahi, Rangpur & Sylhet Division 5) Equipment Part on full Turn-Key Basis” Package-02, Lot-1, Total 178 Sites of Dhaka & Mymensingh Divisions. 6) Equipment Part on full Turn-Key Basis” Package-02, Lot-2, Total 235 Sites of Barishal, Chittagong & Khulna Divisions.7) Equipment Part on Full Turn-key Basis Package-02, Lot-3: Total 174 Sites of Rajshahi, Rangpur & Sylhet Division. | Gob(ADP) | July, 2018 to December, 2019 | 4498.00 lac |
| 8 | ILDTS Policy-2007 Compliance Project. | 1. Installation of IGW with NGN facility 2. Installation of ICX at Dhaka, Chittagong, Sylhet, Khulna & Bogura 3. Upgrading BTCL’s existing IIG 4. Central Billing System 5. Computerized Accounting System | BTCL | 01 Apr 2009 to 30 Sep 2013 Extended to 30 Apr 2014 | 10744.00 lac |